
In furtherance of the rehabilitation works on the Ojota Interchange to Ojota Second Pedestrian Bridge portion of Ikorodu Road, the State Government has announced a traffic diversion on the Ikorodu bound Service Lane from Monday, 23rd January, 2023 for a duration of two weeks.
A statement signed by the Commissioner for Transportation, Dr. Frederic Oladeinde, said the diversion was necessary in order to repair some asphalt failings observed at the edge of the ramps inwards lyana-Oworo/Gbagada axis and Seven-Up on Lagos/Ibadan Expressway, adding that alternative routes have been provided for Motorists to utilise during the period.
He explained that vehicles coming from Maryland on the Service Lane will be diverted at the Second Pedestrian Bridge into the Main Carriage Way to make a turn at Mile 12 Underpass and continue their Journey on Lagos/Ibadan Expressway or link Demurin Road along Ketu axis of the Expressway.
Comentarios